Abstract
An arrangement which provides for automatically shedding the
separable loads of a power distribution area in accordance with
predetermined priorities established, not on a basis of system
frequency or rate of system frequency change as is present day
conventional practice, but on a basis of actual area capability as
compared to area load. The total prevailing capability of the power
sources of the area is compared with the prevailing area load to
produce a signal indicative of the prevailing area reserve power.
That signal is compared with the preferred reserve and the
difference is then the excess or deficiency with regard to the
preferred reserve, defined as the prevailing area margin. That
margin in turn is compared with the margin settings for each
separable load so that when the margin decreases to a value equal
to or below the margin setting for each separable load, that load
is automatically sequentially disconnected.
|
Inventors: |
Cohn; Nathan (Jenkintown,
PA) |
|
Assignee: |
Leeds & Northrup Company
(Philadelphia, PA)
|
| Family
ID: |
22492736 |
| Appl.
No.: |
05/140,774 |
| Filed: |
May 6, 1971 |
| Current U.S.
Class: |
307/52;
307/57 |
| Current CPC
Class: |
H02J
3/14 (20130101); H02J 2310/60 (20200101); Y04S
20/222 (20130101); Y02B 70/3225 (20130101) |
| Current International
Class: |
H02J
3/12 (20060101); H02J 3/14 (20060101); H02j
003/38 () |
| Field of
Search: |
;307/52,57,29 |
References Cited
[Referenced By]
U.S. Patent Documents
Primary Examiner: Trammell; James D.
Claims
What is claimed is:
1. Apparatus for automatically shedding load in a power
distribution area in which a plurality of sources are connected to
supply power to a plurality of loads comprising
a first means operable to produce a signal representative of the
magnitude of the prevailing reserve power of the area, and
a second means operable to disconnect at least one of the loads of
said area when said prevailing reserve power signal drops to a
predetermined value.
2. Apparatus as set forth in claim 1 in which said first means
includes
means responsive to the power flow to or from the sources of the
area for producing a first signal representative of the prevailing
area load,
means for producing a second signal representative of the total
prevailing capability of said sources, and
means for comparing said first and second signals to produce said
signal representative of the prevailing reserve power.
3. Apparatus for automatically shedding load in a power
distribution area in which a plurality of sources are connected to
supply power to a plurality of loads, comprising:
means operable to produce a signal representative of the magnitude
of the prevailing reserve power of the area, including;
1. means responsive to the power flow to or from the sources of the
area for producing a signal representative of the prevailing area
load, including;
a. means for producing first signals respectively representative of
the power flow from each of the generated sources connected to
supply power to said area,
b. means for producing second signals respectively representative
of power flow on each of the tie lines connected to supply power to
or from said area, and
c. means for summing said first and second signals to produce said
prevailing area load signal;
2. means for producing a signal representative of the total
prevailing capability of said sources, including;
a. means for producing third signals respectively representative of
the capability of each of said generating sources,
b. means for producing fourth signals respectively representative
of the capacity of each of said tie lines, and
c. means for summing said third and fourth signals to produce said
total prevailing capability signal; and
3. means for comparing said prevailing area load signal and said
total prevailing capability signal to produce said signal
representative of the prevailing reserve power; and
means operable to disconnect at least one of the loads of said area
when said prevailing reserve power signal drops to a predetermined
value.
4. Apparatus as set forth in claim 1 in which said second means
includes
means for producing for each portion of the load to be shed a
margin setter signal representing the magnitude of prevailing
reserve power at which the associated load should be shed,
means for individually comparing each of said margin setter signals
and said signal representing the prevailing reserve power, and
means responsive to said last named means for disconnecting each of
said loads when the signal representing the prevailing reserve
power equals the associated margin setter signal.
5. Apparatus as set forth in claim 1 in which said first means
includes
means responsive to the power flow from said sources for producing
a first signal representative of the total power flow to the loads
of said area,
means for producing a second signal representative of the total
capability of said sources,
means for producing a third signal representative of the preferred
reserve power, and
means for comparing the difference between the values of said first
and second signals and the value of the third signal to produce a
resultant signal representative of the prevailing area margin.
6. In a power distribution area having a plurality of sources
providing power to a network to which a plurality of loads are
connected, apparatus for selectively shedding said loads in
accordance with pre-established priorities comprising
transducer means associated with each of said sources for producing
signals representative of the power being provided to said network
from each of said sources,
capability setter means each associated with one of said sources
for producing capability signals each representative of the power
producing capability of the associated source,
means responsive to said power signals and said capability signals
for producing a signal representative of the prevailing reserve
power of said sources,
means for producing a signal representative of the preferred
reserve capability of said area,
means for comparing the prevailing reserve power signal and the
preferred reserve capability signal to produce a signal
representative of the prevailing margin of the area,
means for producing for each of the loads a margin setter signal
representing the magnitude of the prevailing margin of the area at
which the associated load is shed,
comparison means for comparing each of said margin setter signals
to the prevailing margin signal and operative when said last named
signal decreases to the value of a margin setter signal to
disconnect the associated load from the network when that load is
next in priority to thereby avoid loading said area beyond the
prevailing area margin while maintaining priorities in the shedding
of said loads.
7. Apparatus as set forth in claim 6 which includes
means operable to prevent the transducer means associated with
those sources which are tie lines from producing signals which are
of sense representative of power flow from said area over said tie
lines.
Description
BACKGROUND OF THE INVENTION
This invention relates to apparatus for selectively shedding blocks
of load in an area of an interconnected power system in accordance
with predetermined area priorities so that the power system can
continue in operation when the generating and tie line capabilities
of the area are inadequate to meet the normal total connected load
of the area.
In power distribution systems, including those which have
interconnected areas maintaining generation to match their own load
changes and interchanging power with other areas, the procedures
which have been used for load shedding have been based upon the
system frequency or the rate of change of system frequency. More
specifically, load shedding practices have involved the progressive
shedding of load in steps as the frequency drops in order to bring
the load into balance with generation with the load shedding being
initiated at a particular frequency, such as 59 hz. in a 60 hz.
system, and with all of the load shedding preferably being
accomplished before the frequency reaches 57 hz.
The practice of shedding load on the basis of frequency drop has an
inherent limitation in that it does not serve to identify the area
in which the reason for the dropping frequency exists and thus all
areas shed load, whereas it may only be necessary for one area to
shed load. In addition, it will be evident that the shedding of
load on the basis of a drop in frequency results in the shedding
occurring only after the problem or emergency has already
arisen.
Under certain circumstances, as for example when the cause for the
frequency drop is in one particular area of an interconnected
group, if other areas assist by shedding load, the result can be a
higher than permissible tie line flow toward the area in need,
causing its ties to trip and depriving the area of all assistance
from the remainder of the interconnection.
It is an object of this invention to provide apparatus for shedding
of load wherein an individual area of an interconnected power
system can identify any imbalance between its load and its
capability before the imbalance actually occurs and can therefore
shed load in good time to prevent loss of area operability and
possible catastrophic conditions for the area and the system.
SUMMARY OF THE INVENTION
In carrying out this invention there is provided apparatus for
automatically shedding load in a power distribution area in which a
plurality of sources are connected to supply power to a plurality
of loads. This apparatus includes a means operable to produce a
signal which is representative of the magnitude of the prevailing
reserve power of the area and other means which are operable to
disconnect at least one of the loads of the area when the
prevailing area reserve power drops to a predetermined value.
DEFINITION OF PREVAILING AREA CAPABILITY
When an area is part of an interconnected system, its ability to
satisfy its own area load may be defined in various ways, depending
on agreed upon relationships with its neighbors. The area may
consider that it can count on the full incoming power capacity of
its tie lines to augment its own on-line generating capacity. It
may count on only a portion of its incoming power capacity as a
firm commitment from its neighbors. On the other hand, it may have
a firm commitment to supply power to its neighbors when they
require it either in the amount of its own tie line capacity or a
firm portion thereof, the amount of which in either case it would
subtract from its own on-line generating capacity to establish its
area capability. Finally, it may choose to define its capability
only in terms of its own generating capacity.
Thus the following relation may be written for prevailing area
capability, C:
C = .SIGMA. G.sub.n ' - .SIGMA.T.sub.m '
where .SIGMA.G.sub.n ' is the capacity of the area's n on-line
generators, .SIGMA.T.sub.m ' may be defined by the area as
either:
a. total incoming capacity of the area's m ties with its neighbors
in which case it has a minus sign;
b. something less than incoming capacity of the area's m ties with
its neighbors, representing a firm commitment from neighbors, and
having a minus sign;
c. total outgoing capacity of its m ties with its neighbors, in
which case it has a plus sign;
d. a firm power flow commitment outward to its neighbors but less
than outward capacity, in which case it also would have a plus
sign; or
e. zero, reflecting no firm dependence on, or commitment to tie
line flow in calculating area capability, the area capability
simply being its own area on-line generating capacity.
The load shedding apparatus described in this invention can readily
be accommodated to any one of the foregoing definitions of area
capability.
OTHER TERMINOLOGY AND DEFINITIONS
Prevailing area load is designated L, and is defined as:
L = .SIGMA. G.sub.n - .SIGMA.T.sub.m
where .SIGMA.G.sub.n is prevailing area generation representing sum
of the generation of the n generators in the area,
.SIGMA.T.sub.m is prevailing area tie line flow for the m ties to
neighboring areas and is plus for outgoing power and minus for
incoming power.
Note that in some instances an area may wish to include only
incoming tie line power in the calculation of L by the foregoing
relationship.
Prevailing area reserve power is designated R, and is defined
as:
R = C - L
Preferred area reserve is designated P, and is the reserve level
above which the area would prefer that the prevailing area reserve
power be.
Prevailing area margin is designated M, and is defined as:
M = R - P
Margin settings, designated M' with suitable sequential subscripts,
are set to margin levels at which selected loads are to be
shed.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a block diagram showing the circuit of the invention in
one form.
FIG. 2 shows another modification of a portion of FIG. 1 for taking
into account tie line interchange of only one direction in
computing total reserve.
Description of the Preferred Embodiments
In FIG. 1 there is shown a plurality of generators G.sub.1, G.sub.2
and G.sub.3 which are connected by lines 11, 12 and 13,
respectively, to the area bus 16 upon the closing of the respective
breakers B.sub.1 , B.sub.2 and B.sub.3 . The area which includes
the generators G.sub.1, G.sub.2 and G.sub.3 is shown as being
connected to other areas by interconnecting tie lines T.sub.1 and
T.sub.2 which connect to the bus 16 through breakers B.sub.t1 and
B.sub.t2.
The area bus 16 is shown as having individual interconnecting lines
21, 22, 23 and 24 which connect the loads L.sub.1, L.sub.2, L.sub.3
and L.sub.4, respectively, to the area bus 16. The connections
between the bus 16 and loads L.sub.1, L.sub.2 and L.sub.3 are shown
as being made through breakers having contacts S.sub.1, S.sub.2 and
S.sub.3, respectively, while L.sub.4 is shown as a load which is
not subject to shedding. The S.sub.1, S.sub.2 and S.sub.3 breakers
will normally be located at a point distant from breakers B.sub.1
-B.sub.3.
If all of the generators G.sub.1 -g.sub.3 in the area are being
utilized as power sources and power is being imported or exported
over both tie lines T.sub.1 and T.sub.2, breakers B.sub.1 -B.sub.3
and B.sub.t1 and B.sub.t2 will be closed as well as switches A and
D. In determining when load is to be shed, an account will be taken
both of the capability of the generators G.sub.1-G.sub.3 and the
capability of the tie lines T.sub.1 and T.sub.2 to supply
power.
Each of the breakers B.sub.1, B.sub.2, B.sub.3, B.sub.t1 and
B.sub.t2 is shown as incorporating two contacts. One completes the
circuit carrying the power to or from the bus 16 and the other
completes a circuit from each of the respective capability setters
G.sub.1 ', G.sub.2 ', G.sub.3 ', T.sub.1 ' and T.sub.2 ' to a
summing circuit consisting of operational amplifiers 30 and 32.
The operational amplifier 30 is operative to sum the potential
established by the capability setters T.sub.1 ' and T.sub.2 ' while
the operational amplifier 32 is effective to sum the output of
amplifier 30, connected through closed switch A to one of the input
lines of amplifier 32, and the outputs of the other capability
setters G.sub.1 '-G.sub.3 '. As a result of this summation, there
is produced as an output from amplifier 32 on line 34 a signal C
representative of the prevailing capability of the power sources of
the area shown. Thus,
C = G.sub.1 ' + G.sub.2 '+ G.sub.3 ' - T.sub.1 ' - T.sub.2 '
where T.sub.1 ' and T.sub.2 ' are plus for firm commitments of
power out of the area, minus for firm power commitments into the
area, and each is zero if tie line capacity is not to enter into
the capability computation.
With switch D closed as well as switch A there is provided by
another summing circuit a signal L on line 36 representing the
total actual power at bus 16, which is the prevailing area load.
This signal is provided by summing the output of each of the
generators G.sub.1, G.sub.2 and G.sub.3 and power flow measured on
lines T.sub.1 and T.sub.2. The tie line power flow measurements are
made by utilizing transducers 41 and 42 which are designed to
produce on the respective lines 43 and 44 D.C. potentials of
magnitude and polarity indicative of the power flow in the
respective tie lines T.sub.1 and T.sub.2. The lines 43 and 44 are
input lines to operational amplifier 48 which sums the inputs so as
to produce on line 50 a signal representative of the total tie line
power flow into or out of the area. With switch D closed, the
potential on line 50 provides an input to operational amplifier 54
which also receives inputs from transducers 61, 62 and 63. These
transducers may be any one of a number of available watt
transducers capable of providing a D.C. output potential
proportional to the power flow on the connected power line.
Thus,
L = G.sub.1 + G.sub.2 + G.sub.3 - T.sub.1 - T.sub.2
where T.sub.1 and T.sub.2 are plus for outgoing power and minus for
incoming power.
The operational amplifier 66 receives its inputs from lines 34 and
36 with these lines being connected so as to provide a comparison
between the signals C and L on those lines or, in other words, a
subtraction of those signals to produce on the output line 68 of
amplifier 66 a signal representative of the available reserve power
R of the area. Thus:
R = C - L
The signal R would then represent the total prevailing reserve of
the area. This computed total prevailing reserve may be compared to
a preferred reserve P by utilizing amplifier 70 to compare the
signal on line 68 with the signal on line 72. The signal on line 72
is derived from a manual setter, identified as block 74, which
produces on its output line a signal representative of the
preferred reserve P of the system. That signal will be provided as
an input on line 72 when switch 76 is closed. Thus, amplifier 70
provides a comparison of the signal on line 72 with that on line 68
so as to provide a subtraction to produce on line 78 a signal M
which represents the margin for the system in terms of power.
Thus:
M = R - P
The signal M can be utilized as a basis for determining when the
various loads should be shed in order to maintain the desired
relationship between area capability and area load. The value of P
may in some cases remain fixed. In such a case the value of M can
be said to be representative of the prevailing reserve as is the
signal R.
The criteria which establish the basis for the shedding of the
several loads are the magnitudes of the signals produced by the
margin setters M.sub.1 ', M.sub.2 ' and M.sub.3 ' which,
respectively, set the available margin below which the respective
loads L.sub.1, L.sub.2 and L.sub.3 should be shed, and the
arrangement of the sequence contacts S.sub.1 ' and S.sub.2 ' which
determine the sequence in which the load shedding takes place. The
signals generated by the margin setters M.sub.1 ', M.sub.2 ' and
M.sub.3 ' may be referred to as margin setter signals.
Thus, for example, the output of setter M.sub.1 ' on line 81 is a
margin setter signal of magnitude M.sub.1 ' which is compared with
the magnitude of signal M in the comparing circuit represented by
block 82, and if M is equal to or less than M.sub.1 ', there is
then produced a potential on line 84 which is effective to energize
actuator 85 to open breaker contact S.sub.1 and thereby disconnect
or shed load L.sub.1. Simultaneously with the opening of S.sub.1
the contact S.sub.1 ' is closed so that the load which is next in
the desired sequence for shedding can be shed under appropriate
conditions. The contacts S.sub.1 and S.sub.1 ' will remain in those
positions due to the action of the mechanical latch 86 shown
associated with the actuator 85. The other actuators 90 and 94 are
similarly equipped to be latched. As a result of the shedding of
load L.sub.1, there will be an increase in the magnitude of the
signal M by an amount equal to that of load L.sub.1.
The output of setter M.sub.2 ' on line 88 is compared by the
comparing circuit of block 87 with the magnitude of signal M and
when M is equal to or less than M.sub.2 ', the output on line 89
through closed contact S.sub.1 ' causes an energization of actuator
90 to disconnect and latch breaker contact S.sub.2 and connect
contact S.sub.2 ' and thereby shed load L.sub.2 and set up load
L.sub.3 as the next load to be dropped in the established sequence.
After load L.sub.2 is shed the magnitude of M will rise by an
amount equal to L.sub.2.
The signal on line 91 from setter M.sub.3 ' is compared with the
magnitude of signal M in the comparison circuit 92. When M is equal
to or less than M.sub.3 ' actuator 94 is energized by the output of
block 92 which is connected through contact S.sub.2 '. Breaker
contact S.sub.3 is disconnected and latched upon energization of
actuator 92 and load L.sub.3 is shed. M will then increase by the
magnitude L.sub.3. The signals M.sub.1 ', M.sub.2 ' and M.sub.3 '
produced on lines 81, 88 and 91, respectively, may be established
so that the loads L.sub.1, L.sub.2 and L.sub.3 are shed at
different values of M. Alternatively, M.sub.1 ', M.sub.2 ' and
M.sub.3 ' can all be set at the same value since S.sub.1 ' and
S.sub.2 ' are effective to establish the sequence for the shedding.
Alternatively, M.sub.2 ' and M.sub.3 ' could be omitted and
actuator 85 could be coupled to operate a sequential switch which
could disconnect the loads sequentially based in each case on the
comparison of M.sub.1 ' and M.
The comparing circuits, such as 82, may incorporate a time delay so
that the associated load, such as L.sub.1, will not be shed until
the tie lines to the area have had a chance to respond. Such an
arrangement would be used when the area is depending on the ties to
provide help in meeting the area load requirement.
Under some circumstances it may be desirable to open switches A and
D and thereby omit from the operation of the load shedding system
shown in FIG. 1 any consideration of the power flow on the tie
lines T.sub.1 and T.sub.2.
As an example of one illustration of the manner in which the
circuit of FIG. 1 operates, consider the sequence of events
detailed in the following paragraphs.
Assume the signal on line 36 represents a prevailing area load of
1,050 MW, or in other words, a total supply of power from
generators G.sub.1, G.sub.2 and G.sub.3 and tie lines T.sub.1 and
T.sub.2 to the bus 16 of 1,050 MW for the supply of loads L.sub.1
-L.sub.4. Also, assume that the signal on line 34 represents a
prevailing area capability of 1,200 MW representing the maximum
power which can be supplied by the generators and ties to the bus
16 for the loads L.sub.1 -L.sub.4. Under those conditions the
prevailing area reserve signal on line 68 would represent 150 MW,
and if we assume that the preferred reserve represented by the
signal on line 72 with switch 76 closed represents 50 MW, then the
signal on line 78 would be a positive signal representing 100 MW
which is the prevailing area margin or the increase in the loads
L.sub.1 -L.sub.4 that can occur before the margin is reduced to
zero. Thus, the prevailing area load can be increased 100 MW to
equal the prevailing area capability minus the established
preferred reserve before the margin becomes zero.
Assuming that the loads L.sub.1, L.sub.2, L.sub.3 and L.sub.4 are
increasing in magnitude and assuming that the settings M.sub.1 ',
M.sub.2 ' and M.sub.3 ' are respectively 0 MW, -10 MW and -15 MW,
then it will be evident that when the signal on line 36 has reached
a value representative of a load of 1,150 MW, the signal on line 68
will represent a prevailing reserve of 50 MW while the prevailing
margin represented by the signal on line 78 will be zero. Load
L.sub.1 will then be disconnected. If we assume that the load
L.sub.1 at the time of disconnection represented 30 MW, there will,
as a result of the normal load-frequency control in the area, be a
compensating change in the generation of the generators G.sub.1
-G.sub.3 and the signal on line 36 will then represent 1,120 MW so
that the signal on line 68 represents 80 MW and the signal on line
78 represents a 30 MW margin.
If after the disconnection of load L.sub.1 the loads L.sub.2,
L.sub.3 and L.sub.4 increase so that the signal on line 36
represents a prevailing area load equal to 1,160 MW, then the load
L.sub.2 will be disconnected. Assuming that in disconnecting load
L.sub.2 the only loads left are loads L.sub.3 and L.sub.4 and that
that prevailing load is of the magnitude of 1,100 MW, then as a
result of the load-frequency control on the generators G.sub.1,
G.sub.2 and G.sub.3 the signal on line 36 will represent 1,100 MW
and the signal on line 68 will then represent 100 MW while the
signal on line 78 will represent +50 MW. After the disconnections
of loads L.sub.1, L.sub.2 there must be an increase in the loads
L.sub.3 and L.sub.4 of 65 MW to a value of 1,165 MW total before
the limit M.sub.3 ' is reached and the load L.sub.3 is disconnected
since at that value for the sum of L.sub.3 and L.sub.4 the signal
on line 78 will have reached a value representative of -15 MW.
The above example of the manner in which the circuit of FIG. 1
operates may be further illustrated by the following table:
L.sub.1 L.sub.2 L.sub.3 L C P M M.sub.1 ' M.sub.2 ' M.sub.3 ' 36 34
72 78 Shed Shed Shed ? ? ?
__________________________________________________________________________
1050 1200 150 50 100 0 No -10 No -15 No 1150 1200 50 50 0 0 Yes -10
No -15 No 1120 1200 80 50 30 0 Yes -10 No -15 No 1160 1200 40 50
-10 0 Yes -10 Yes -15 No 1100 1200 100 50 +50 0 Yes -10 Yes -15 No
1165 1200 35 50 -15 0 Yes -10 Yes -15 Yes
__________________________________________________________________________
In still other circumstances it might be desirable to omit the
inclusion of the signal on line 72, representative of the preferred
reserve, in which case the switch 76 would be opened and the signal
on line 78 would then be equivalent to the signal on line 68 and
the loads would be shed in accordance with the established
priorities based upon the prevailing area reserve established by
the signal on line 68. The computation of that reserve would, of
course, be independent of tie line capability and tie line power
flow when the switches A and D are open. It would be independent of
tie line capability but would include tie line flow in the
computation of area load when switch A is open and switch D is
closed.
In the circuit of FIG. 1 there is shown a means for automatically
disconnecting or shedding load in a particular area, it being
assumed that the reconnection of the load may be advantageously
accomplished by manual means as the generating capability of the
area increases or the load decreases to the point where additional
load can be added in the area.
Under certain circumstances it is desirable to take into account
the power flow over the tie lines T.sub.1 and T.sub.2 only when it
is in a direction providing power flow to the bus 16. FIG. 2 shows
a circuit diagram in block form for accomplishing that mode of
operation. The circuit of FIG. 2 differs from that shown in FIG. 1
only in that it incorporates diodes 110 and 112, each of which is
shown with its cathode connected to ground and its anode connected
to the output of the associated transducers 41 and 42, so as to
prevent input signals from appearing on lines 43 and 44 whenever
the outputs of the transducers 41 and 42, respectively, are
positive in potential, as when power is flowing out of the area
over tie lines T.sub.1 and T.sub.2. The diodes 110 and 112 still
allow the negative potential outputs on lines 43 and 44 to be
summed by the amplifier 48. Thus, an area utilizing the arrangement
of FIG. 2 would not take into consideration any power flow from the
area over tie lines T.sub.1 and T.sub.2, in calculating the
magnitude of prevailing area load, L.
* * * * *